The world of koi and garden ponds

Manufacture of the three-vet filter — Assembly and sealing

Second and last part · The 180-litre multi-bidon filter

The construction continues with the installation of the bulkheads, the fixing of the vats and the connections, before the leakproofness test.

Protect slices from panels

The slices of the cut-out panels are covered with a layer of silicone spread over the spatula.

Protecting slices from panels — photo 12
Protect slices from panels · Photo 12 · Click to enlarge.
Protect the slices of the panels — photo 13
Protect slices from panels · Photo 13 · Click to enlarge.

Position bulkheads

The panels are positioned in the cans with a 10 cm passage above the bottom.

Positioning the bulkheads — photo 14
Position partitions · Photo 14 · Click to enlarge.
Positioning the bulkheads — photo 15
Position partitions · Photo 15 · Click to enlarge.

Fix and water the panels

Before final tightening, silicone is applied to the screws. The inner corners are also coated, as shown in photos 16 to 17.

Fixing and waterproofing the panels — photo 16
Fix and water the panels · Photo 16 · Click to enlarge.
Fixing and waterproofing the panels — photo 16a
Fix and water the panels · Photo 16a · Click to enlarge.
Fixing and sealing the panels — photo 16b
Fix and water the panels · Photo 16b · Click to enlarge.
Fixing and waterproofing the panels — photo 17
Fix and water the panels · Photo 17 · Click to enlarge.

Check the overflow

Photo 18 shows the third can, which receives the exit, as well as the 2 cm overflow space.

Check overflow — photo 18
Check overflow · Photo 18 · Click to enlarge.

Shade the screws of the support

Once the barrels are fixed, the ends of the screws exceeding the support plate are ground.

Shaping the screws of the support — photo 19
Shade the screws of the support · Photo 19 · Click to enlarge.
Shaking the screws of the support — photo 20
Shade the screws of the support · Photo 20 · Click to enlarge.

Reconnect and test the set

In the original assembly, the junction pipes and the exit elbow are assembled with silicone. After drying, a watering allows to check the seal. Respect the time of polymerization prescribed for the product used before this test.

Connect and test the set — photo 21
Connect and test the set · Photo 21 · Click to enlarge.
Connect and test the set — photo 22
Connect and test the set · Photo 22 · Click to enlarge.

A shared achievement

Artgraphbegain and Keeppool production for Aquatechnobel.

See the preface and warning of DYS DIY.

The installation of three vats