Rehabilitation of an borehole pond — Filling of the pond
La Bassin du Brainois · Part 9
Of all the creation operations of a pond, filling is certainly one of the most pleasant. This phase is also more important than it seems.
Measuring water volume
Do not forget to record the water meter index before and after filling. The difference allows you to know the added volume, provided that no further water sampling is carried out during this period.
The capacity of the pond is an essential data, particularly for the correct calculation of doses of possible treatment.
The pond gradually fills up
The tap is opened and the level gradually rises.
Turn the foam jet on
As soon as the pond is filled to two thirds, the Brainois starts a pump to create a foaming jet. In the report, this ventilation aims to promote the degassing of the pipe water and the evacuation of chlorine.