The world of koi and garden ponds

Multi-drum filter dressing

The Patpre2000 multi-drum · Part 4

This fourth part presents the dressing of the four tanks, the mounting of the valves, the sealing checks and the finishings of the base.

The top panel

I had to make a compass to trace the circular openings at the top of the filter. They will allow to pass the tops of the tanks.

The compass used to trace the openings
The compass used to trace the openings · Click to enlarge.

The four tanks now pass through the panel. Part of the dressing is made of 4 mm Bakelized plywood.

The four tanks through the top panel
The four tanks through the top panel · Click to enlarge.

The facade and the protection of wood

The front of the filter is made with a 12 mm panel. To the right are the two water inlet pipes, above the air pipe passage and to the left the electrical wiring passage. The top panel overflows to accommodate a small cabinet for air pumps, UV and electric fence generator.

The facade and passages of pipes and cables
The facade and passages of the pipes and cables · Click to enlarge.

A layer of lasure strengthens the resistance of the woodwork to moisture. The final assembly can begin: the drain pipes are placed and glued. The tanks can no longer be removed.

Wood protection and purge assembly
Wood protection and purge assembly · Click to enlarge.

The slope and the air passages

This overview shows the slight slope of the top panel, about 20 mm.

Overview of the dressing and its slope
Overview of the dressing and slope · Click to enlarge.

This is the expected outlet for air pipes.

The passage of air pipes
The passage of air pipes · Click to enlarge.

The Four Purge Valves

Detail of a backwash outlet.

A filter purging output
A filter purging output · Click to enlarge.

A small strip of plywood closes the part of the filter reserved for purges. The four ball valves are mounted and glued.

The four ball valves mounted
The four ball valves mounted · Click to enlarge.

Sealing of valves and base

A mastic cord around the mounting of the valve ensures waterproofing with rainwater.

Detail of sealing around a valve
Detail of sealing around a valve · Click to enlarge.

Once the purges are mounted, the 12 mm plywood panels can be attached to start the base. Their attachment remains temporary, in case a leak appears.

The temporary closure of the base
The temporary closure of the base · Click to enlarge.

Watering and leak control

A foam board is held with tape, always in order to intervene in the event of a leak.

The foam panel provisionally fixed
The foam panel provisionally fixed · Click to enlarge.

The vats are filled with 60 cm of water so that they get in place and then immobilized with a polyurethane foam bomb. In this realization, the author waits for a week to look for possible leaks in the purges.

The watering of tanks and their immobilization
The watering of the tanks and their immobilization · Click to enlarge.

Watertight passages between vats

After this one-week check, TEC7 is applied in cordon on either side of the passages between the vats. The author recalls the preparation of the surfaces by a light sanding and degreasing before applying the mastic.

The seal cord between two tanks
The cord between two tanks · Click to enlarge.

Here is the application inside a tank. The brown and white colours of the TEC7 match the products available during successive purchases.

The seal inside a tank
Sealing inside a tank · Click to enlarge.

Isolation and closure of the base

Two other polyurethane foam bombs are used to isolate the purging pipes. Two holes, one on each side of the valve, allow to insert the tube of the bomb and inject the product. The foam thus fills the inside of the base around the pipes, isolate them and mechanically hold them. A hole is visible to the right of the valve; the foam plates of the base have been removed for photo. In the absence of leakage, the 12 mm plywood panel can be permanently fixed.

Isolation of purge pipes in the base
The insulation of the purge pipes in the base · Click to enlarge.

One side of the filter is now dressed.

One side of the filter after dressing
One side of the filter after dressing · Click to enlarge.

Side finishes

On the side of the future small cabinet, the outlet pipe is also in place. The exit is disconnected to reach exactly an existing pipe caught in the concrete.

The side of the cabinet and the exit off
The side of the cabinet and the exit off · Click to enlarge.

The second side is also closed. Panel slices are protected with TEC7.

The closing on the second side
The closing on the second side · Click to enlarge.

The filter completed and the grid

The filter is finished: it remains to be put in place.

Multi-drum filter dressed and ready to install
Multi-drum filter dressed and ready to install · Click to enlarge.

This grid is inspired by those made by Imkal. It is made with electric tubes of two different diameters. The largest are drilled to let the smallest pass. Some parts can, if necessary, be glued with TEC7.

The grid made with tubes of two diameters
The grid made with tubes of two diameters · Click to enlarge.

The materials, mastics and deadlines described correspond to this realization. Respect the instructions of the products used, especially for compatibility of the supports, drying and conditions of watering.

A production of Patpre2000 for Aquatechnobel.

See the preface and warning of DYS DIY.

Part 5: the rest of the story →