A pond dedicated to the koi
The desired pond is specialized for koi, with a Japanese-inspired layout: unplanted interior, coniferous on the outskirts, cascade and pebbles or larger stones.
For an approximate volume of 40 to 50 m³, I opted for a parpaing structure and gravity filtration.
Plans and filtration
The plans are worked out throughout the winter of 2004. UV is connected after filtration elements, a provision chosen for the technology used on this project.
The prefiltration is mechanical and the filtration is biological. A classic Japanese filter matting system, or another media, completes the set on the return of the skimmer.
The clear water return pipes are mounted in opposition to improve the circulation in the pond and to be able to reverse the current with the valves of the technical room.

Legend of the final schema
- UltraSieve II prefilter: two 110 mm entrances and integrated purging valve
- UltraBead filter with built-in purge valve
- UV
- Pump
- Mechanical filtration on brushes and biological on Alfagrog
- Fountain pouring on a pebbly beach
- Skimmer
- 3 kW heating element
- Puisard discharge of charged water, consisting of two chambers; cellar pump about 200 cm below the reference level
Valves and fittings
- (a) 110 mm guillotine valve on each prefilter arrival.
- (b) 110 mm ball valve on arrival of loaded water for bottom purging; minimum height indicated on the plane: -130 cm.
- (c) Non-return valve.
- (d) Ball valve allowing to isolate the filter during maintenance.
Colours of pipes: blue and green for clear water returns according to variations; fine red for 50 mm arrivals; thick red for 110 mm arrivals.
Provide for the purging of bottom drains
On this gravity project, the presence of a purge valve close to the bottom is an important point for cleaning PVC bottom drains and pipes.
JFR was concerned that the large waste would not go sufficiently back to the prefilter entrance and eventually settle into the pipelines, reducing short-term flow and posing a long-term problem. After testing, he stressed the usefulness of this valve.
Another personal choice, without making it an obligation: each bottom cap or wall socket is associated with an independent prefilter and filter. The aim is to separate the circuits, optimize their operation and facilitate their maintenance.

Development of the project
Many discussions on the ATB forum were necessary before arriving at the chosen scheme. Here are the stages of this reflection.
The first positioning of filters
The first diagram gave an overly approximate positioning of the filtration systems. JFR therefore further studied the arrival of bottom water in order to limit the risk of deposits in the pipes and at the level of the bottom drains.

A First Purge Valve
The second proposal introduces a purge valve (4) into the drain cellar. For JFR, this provision does not solve the problem sufficiently yet.

Visiting room scenarios
This board presents several scenarios for the visiting room and purging of the bottom bottom drains.
The first one uses a PVC tube simply attached. JFR advises against this installation: the pressure and the whirlpool make it difficult to reposition, with a risk of loss of watertightness.
The second provides access for a large pin. It would allow to take off the depots, but their evacuation would remain to be resolved.
The third brings the valve closer to the bottom. JFR then seeks to maintain a sufficient level difference during purging, despite the rise of water in the visiting chamber. In its realization, the valve is located 50 cm from the bottom.

Study water returns
Since the filtration part is defined, it remains to work the pipes back to the pond to improve the direction of current.

Orient the nozzles back
In this intermediate solution, the pipes placed on the side of the pond are oriented to print a current direction.

A more complex reversible system
Another proposal uses valves to vary the direction of current. The opposite sides of the pond work in addition. However, this solution has a higher cost and more complex mounting.

The assembly finally retained