JFR Koi pond — Construction
Part II · Earthworks in December 2004 and masonry from March 2005
From digging the pit to finishing coatings, the photos follow the construction of the pond and the laying of the pipes.
Earthmoving and the choice of structure
The mineral and square aspect of the buildings leads to the choice of a formal pond, adapted to the setting of the courtyard. In December 2004, the 50 m³ pit was dug with the help of a mechanical shovel of 7 tons. With the abundance, nearly 80 m³ of land were displaced. The building in parpaings was entrusted to a masonry company. The masons retained 32 kg of blocks, poles and two levels of chaining. The masonry work began in March 2005.
Setting up the bottom drains of substance
The bottom covers and their pipes are put in place.
Foundations
The photos show the realization of the foundations of the pond.
The first level of walls
The first level is high with two posts on each length and one post on each width. It ends with a chaining made with U-blocks.
Second level and wall sockets
The second level rises on the same bases as the first, with the installation of intermediate water intakes in the walls.
Tracking water returns
Water return locations are identified and wall crossings are installed.
Upper chaining
The second level ends with a link. The photos show its realization and the water returns positioned.
Skimmer and coatings
The skimmer is installed. A finish coating loaded with fiberglass and added with a water-repellent product is applied to the walls. The floor is prepared to receive the chape.
The casting of the bottom
The bottom is cast with a concrete whose dosage announced in the report is 350 kg. Finish coating is also fibrated and hydrofused.
The pipelines of the intermediate outlets
The 90 mm PVC pipes are installed to connect the intermediate water outlets.