The world of koi and garden ponds

The pool of Serge — Sets the ECOLAT borders

Construction with ECOLAT and ECOPIC · Part 2

After the preparation and implantation of the pickets, this second part follows the presentation of the border, the postponement of the levels and the fixation of the ECOLAT. Click on the pictures to enlarge them.

1. Complete the pike sinking

Another small effort! On this site, the ECOPIC pickets proved to be easier to sink than the zobé pickets. The report highlights their finesse and resistance to mass beatings.

Finish the pike sink · photo 1
Finish the pike sink · photo 1
Finish the pike sink · photo 2
Finish the pike sink · photo 2
Finishing the pike sink · photo 3
Finishing the pike sink · photo 3

2. Checking the benchmarks

After a final check, you can start to unroll the ECOLAT border.

Check the markers · photo 1
Check the markers · photo 1
Check the markers · photo 2
Check the markers · photo 2
Check markers · photo 3
Check markers · photo 3

3. Present the ECOLAT border

The ECOLAT border is simply presented against the pickets. Its own weight temporarily keeps it in place.

Show the ECOLAT border · photo 1
Show the ECOLAT border · photo 1
Show the ECOLAT border · photo 2
Show the ECOLAT border · photo 2
Show the ECOLAT border · photo 3
Show the ECOLAT border · photo 3

4. Position the first fixture

The flexibility of the border makes it possible to form curves, even of small radius. The positioning of the first fixation is important. Take the time to adjust it and start with the highest point.

Position the first fixation · photo 1
Position the first fixation · photo 1
Position the first fixation · photo 2
Position the first fixation · photo 2
Position the first fixation · photo 3
Position the first fixation · photo 3

5. Reversing levels

The markers are then carried over to each pole. The laser level facilitates this task. A water level consisting of a pipe and two tubes can also be used to postpone the heights.

Report levels · photo 1
Report levels · photo 1
Report levels · photo 2
Report levels · photo 2
Report levels · photo 3
Report levels · photo 3

6. Attach borders to pickets

The report uses good quality bichromated screws for assemblies exposed to moisture. The border is attached to each picket, leaving at least 5 cm of free strip above the picket. The rest of the report explains this choice.

Fixing the borders to the pickets · photo 1
Fixing the borders to the pickets · photo 1
Fixing the borders to the stakes · photo 2
Fixing the borders to the stakes · photo 2
Attach borders to pickets · photo 3
Attach borders to pickets · photo 3

7. Finishing the pond curves

The latest photos show the tight curves obtained with the ECOLAT. The border is in place. The whole operation took about three hours on this site, including breaks.

Finish the curves of the pond · photo 1
Finish the curves of the pond · photo 1
Finish the curves of the pond · photo 2
Finish the curves of the pond · photo 2
Finish the curves of the pond · photo 3
Finish the curves of the pond · photo 3

Continue reporting

The six stages of the Serge Pond