The pool of Serge — Finishing the edges

Construction with ECOLAT and ECOPIC · Part 5

The pond is filled. This fifth part shows the cutting and folding of the tarpaulin on the edges, then the preparation of the finish of the approaches. Click on the pictures to enlarge them.

1. The pond is filled

The pond is now filled. Photos show its condition before finishing the edges.

The pond is filled · photo 1
The pond is filled · photo 1
The pond is filled · photo 2
The pond is filled · photo 2
The pond is filled · photo 3
The pond is filled · photo 3

2. Start cutting the tarp

The last operation presented in this step consists of cutting the tarpaulin.

Start cutting the tarpaulin · photo 1
Start cutting the tarpaulin · photo 1
Start cutting the tarpaulin · photo 2
Start cutting the tarpaulin · photo 2
Start cutting the tarpaulin · photo 3
Start cutting the tarpaulin · photo 3

3. Keep a membrane margin

Keep a good margin of membrane beyond the border when cutting.

Keep a membrane margin · photo 1
Keep a membrane margin · photo 1
Keep a membrane margin · photo 2
Keep a membrane margin · photo 2
Keep membrane margin · photo 3
Keep membrane margin · photo 3

4. Gradually adjust the cut

A margin too wide may still be adjusted, and too short a cut would be much more difficult to recover.

Gradually adjust the cut · photo 1
Gradually adjust the cut · photo 1
Gradually adjust the cut · photo 2
Gradually adjust the cut · photo 2
Gradually adjust the cut · photo 3
Gradually adjust the cut · photo 3

5. Fold the tarpaulin on the ECOLAT

The overflow left above the pickets allows to fold the tarpaulin on the edge of the ECOLAT. The round end will then be filled.

Fold the tarpaulin on the ECOLAT · photo 1
Fold the tarpaulin on the ECOLAT · photo 1
Fold the tarpaulin on the ECOLAT · photo 2
Fold the tarpaulin on the ECOLAT · photo 2
Fold the tarpaulin on the ECOLAT · photo 3
Fold the tarpaulin on the ECOLAT · photo 3

6. Continue to fold the membrane

Serge continues the work on the membrane and edges.

Continue the membrane fold · photo 1
Continue the membrane fold · photo 1
Continue to fold the membrane · photo 2
Continue to fold the membrane · photo 2
Continue to fold membrane · photo 3
Continue to fold membrane · photo 3

7. The result of the finishing

The photos show the finish obtained after folding the tarpaulin.

The result of the finish · photo 1
The result of the finish · photo 1
The result of the finish · photo 2
The result of the finish · photo 2
The result of the finish · photo 3
The result of the finish · photo 3

8. Prepare the embankment of the approaches

It remains to fill the edges with earth. According to the planned finish, the report envisages stabilization to improve the seat.

Prepare the embankment of the surroundings · photo 1
Prepare the embankment of the surroundings · photo 1
Prepare the embankment of the surroundings · photo 2
Prepare the embankment of the surroundings · photo 2
Prepare the embankment of the surroundings · photo 3
Prepare the embankment of the surroundings · photo 3

9. Stabilize the pond around

The perimeter must be stable to allow for movement around the pond, both during maintenance and during visits.

Stabilize the pond around the pond · photo 1
Stabilize the pond around the pond · photo 1
Stabilize the around the pond · photo 2
Stabilize the around the pond · photo 2
Stabilize the pond around the pond · photo 3
Stabilize the pond around the pond · photo 3

10. Present a finishing stone

A stone is presented on the edge to show an example of the finish of the round.

Present a finishing stone · photo 1
Present a finishing stone · photo 1
Present a finishing stone · photo 2
Present a finishing stone · photo 2

Continue reporting

The six stages of the Serge Pond