Michael's Lagunage — The Cascade
Sixth part · The two water blades
Here is the part dedicated to the installation of the two water blades, in points 7 and 8 of the overall plan.

Mounting stones
The stone assembly for both levels of the waterfall. Michael takes advantage of the roof of the technical room as support for the highest larval.
Michael in action
Michael in action.
The laying of the pavements
The laying of the cobblestones requires a little attention but does not present any particular difficulty.
Preparation of the stabilizer
Here's the set ready to accommodate the stabilized.





