Michael's Lagunage — The Stabilized
Part 7 · Preparation and installation of stabilizers
The construction site continues with the preparation of the stabilised structure, the shaping of the structure and the laying of stones on the outskirts.
Preparation of the stabilizer
Michael is well equipped, he prepares the stabilizer with his concrete mixer.
Laying on the structure
The whole structure remains to be covered.
Stabilization completed
Here is a view after completion, very careful work.
The exit and the overflow
To the right, notice the exit of the lagoon, the overflow is ready to accommodate an elbow to regulate the level of the lagoon.
The stones of the surroundings
Michael lays the stones of the surroundings of the realization.
Stone finishes
Here are two views of the work done.
Land disposal
We've got to clear the land.